Assessing the improvement of information communication technology for the construction SMES in the 4IR

Malingaka Maoeng, Khululekani Ntakana

Article ID: 8198
Vol 9, Issue 1, 2025


Abstract


Purpose: The fourth industrial revolution (4IR) is assured to transform the construction sector from a project-based industry to a market-based industrialised process. Yet, its slow uptake can be attributed to current emphasis on technological adoption. This study focused on the development of small medium enterprises (SMEs) in the construction industry (CI) of South Africa (SA). The study explicitly focused on the adoption of information communication technology (ICT) in the construction SMEs. In a bit to further advance SMEs, the study observed the practice of communication technology tools. The purpose of this paper is to investigate to what extend ICT is practised in the construction SMEs. Methodology: the research design was established on explanatory case study approach in Gauteng province, South Africa – the methodology adopted is quantitative method. The approach was done via the use of survey questionnaires which was distributed virtually by means of emails, LinkedIn and WhatsApp. Participants are questioned regarding their experience of practicing ICT tools within their organizations. Findings: The study findings indicated that ICT tools have been in practice to a negligible extend in SA construction SMEs, the empirical results affirm that the number 1 classified communication tool used in SA construction SMEs is face to face meetings, seconded by phone calls. However, the experience is diverse; it shows that ICT tools are being practised in the organizations with 4IR experience unlike the SMEs without experience that portrays the highly practised paper-based system in their organizations. Originality: the study recommends that the SMEs review the influence of ICT tools in construction and implement them in their organizations considering their benefits to the industry in this era (4IR). This will help maximise the opportunities brought by ICT and further improve the South Africa construction SMEs in terms of technology adoption.

Keywords


construction; fourth industrial revolution; information communication technology; small medium enterprises

Full Text:

PDF


References


Aghimien, D. O., Aigbavboa, C. O., Oke, A. E., and Thwala, W. D. (2019). Mapping out research focus for robotics and automation research in construction-related studies: A bibliometric approach. Journal of Engineering, Design and Technology, pp.2019–2021. https://doi.org/10.1108/JEDT 09-2019-0237

Akinboade, O. A., & Mkowena, M. P. (2012). Drivers of housing technology adoption in South Africa. Journal of Geography and Regional Planning, Vol.5 No.12, pp.328–338. https://doi.org/10.5897/jgrp12.026

Amusan Lekan Murtala, Joshua Opeyemi, Oloke Olayinka (2013). Performance of Build-Operate-Transfer Projects: Risks’ Cost Implications from Professionals and Concessionaires Perspective. European International Journal of Science and Technology Vol.2 No.3, pp.239-250.

Barlett, M. S., (1951) A further note on tests of significance in factor analysis. British journal of psychology, Vol 4, pp.1-2.

Bayode, A., van der Poll, J., and Ramphal, R. (2019). 4th Industrial Revolution: Challenges and Opportunities in the South African Context. 17th Johannesburg International Conference on Science, Engineering, Technology & Waste Management, pp.341–347.

Becerik, (2004). A review on past, present and future of web based project management & collaboration tools and their adoption by the US AEC industry. International Journal of IT in Architecture, Engineering and Construction, Vol.2.

Behm, M. (2008) ‘Construction sector’, Journal of Safety Research, Vol.39 No.2. pp. 175-178. Doi:10.1016/j.jsr.2008.02.007.

ÇAGLAR ÇIFTÇI, Egbu, C.O. and Botterill, K., (2005). Information technologies for knowledge management: their use and effectiveness. Electronic Journal of Information Technology in Construction(ITcon).

Dallasega, P., Rauch, E. and Linder, C. (2018) Industry 4.0 as an enabler of proximity for construction supply chains: A systematic literature review. Computers in Industry, pp. 99, 205-225.

Gaspar, M., Julião, J., and Cruz, M. (2019). Organizational strategies induced by the fourth industrial revolution: Workforce awareness and realignment. Lecture Notes in Electrical Engineering, pp.505, 330–336. https://doi.org/10.1007/978-3-319-91334-6_45

Gilchrist, A. (2016). Introducing Industry 4.0. In: Industry 4.0. Apress, Berkeley, CA. https://doi.org/10.1007/978-1-4842-2047-4_13

GlobalAfricaNetwork. (2020). Building Africa’s 4IR readiness. Available at: https://www.globalafricanetwork.com/company-news/building-africas-4IR-readiness/ (Accessed 20 September, 2020).

Gopalakrishnan, G. and Brindha, G., (2017). A Study on Employee Welfare in Construction Industry, International Jou rnal of Civil Engineering and Technology, 8(10), pp. 07–12.

Hall, D. M., Whyte, J. K. and Lessing, J. (2020) Mirror-breaking strategies to enable digital manufacturing in Silicon Valley construction firms: A comparative case study, Construction Management and Economics, 38(4), pp.322-339.

Hassan, T M; McCaffer, R. (2002). Vision of the large scale engineering construction industry in Europe, Automation in Construction, pp.11, 421-437.

Hassanain . (2000). IFC-Based Data Model for Integrated Maintenance Management. Computing in Civil & Building Engineering. Proceedings of the Eighth International Conference. ASCE, Virgina.

Hawksworth, J., Berriman, R. and Goel, S. (2018) Will Robots Really Steal Our Jobs? An international analysis of the potential long term impact of automation. February. London: PriceWaterhouseCoopers.

Japheth, C., and Kiprotich, K. (2014). An Investigation on Building Information Modelling in Project Management: Challenges, Strategies and Prospects in the Gauteng. 92. Available at: https://wiredspace.wits.ac.za/bitstream/handle/10539/15492/Charles%20Kiprotich_FINAL%20REPORT_February%202014.pdf?sequence=2 (accessed 22 June, 2020).

Kariem, A. (2020). Draft Digital Futures South Africa Digital Readiness for the 4IR. The National Planning Commission. Available at: https://researchictafrica.net/publication/digital-futures-south-africas-readiness-for-the-4IR/ (Accessed 02 December, 2020).

Lekan, M.A. and Ayo, C., (2017) Multi-Parameter Optimization of Cost Entropy For Reinforced Concrete Office Building Projects Using Ant Colony Optimization. Journal of Engineering and Applied Sciences.Vol.12 No.9, pp.2260-2275.

Mahachi, J. (2020). Challenges in Implementing Innovative Building Technologies: Housing Case Studies in South Africa. University of Johannesburg. Johannesburg, South Africa. Availableat: https://ujcontent.uj.ac.za/vital/access/services/Download/uj:34033/SOURCE1 (Accessed 04 October, 2020).

Manyika, J., Chui, M., Miremadi, M., Bughin, J., George, K., Willmott, P. and Dewhurst, M. (2017) A Future That Works: Automation, employment and productivity (Executive Summary). January. McKinsey Global Institute.

Mohammad, W., Deep, S., Dixit R. B., and Khan, M. B., (2017). A Study of Project Success and Procurement Frameworks in Indian Construction Industry. International Journal of Civil Engineering and Technology, Vol.8 No.3, pp. 167–174

Moloi, D., Zibani, S., and Makhubela, R. (2018). Fourth Industrial Revolution and the Future of Government. Natl. Treas. pp.11, 1–34.

Peansupap, V. (2004). An Exploratory Approach to the Diffusion of ICT in a Project Environment. PhD, RMIT University, School of Property, Melbourne.

Schwab, K. (2020). Understand the Impact of the 4IR on Society and Individuals. Available at: https://trailhead.salesforce.com/en/content/learn/modules/impacts-of-the-fourth industrialrevolution/understand-the-impact-of-the-fourth-industrial-revolution-on-society-andindividuals (Accessed 09 April, 2020)

Vadhavkar, S; Pena-Mora, F. (2000). Geographically Distributed Team Interaction Space. Computing in Civil & Building Engineering, Proceedings of the Eighth International Conference, ASCE. Virginia.

Van Rensburg, R. J. (2020). Home/Trades/Construction and the 4IR (4IR) Construction and the 4IR. Available at: https://gildes.solidariteit.co.za/en/construction-and-the-fourthindustrial-revolution-4IR/ (Accessed 23 July, 2020).

Woksepp S. and T. Olofsson (2006). Outline of a Client Oriented Model for ICT Investements In Construction Projects. Proceedings of the Joint CIB W78, W102, ICCCBE, ICCC, and DMUCE International Conference and Computing and Decision Making in Civil and Building Engineering, Montreal, Canada, June (ISSN:2706-6568), https://itc.scix.net/paper/w78-2006-tf518, pp. 14-16

Wollschlaeger, M., T. Sauter, and J. Jasperneite, (2017). ``The future of industrial communication: Automation networks in the era of the Internet of Things and industry 4.0,’’ IEEE Ind. Electron. Mag., Vol.11, No.1, p.1727.

Yeni-letsoko, V., and Pillay, N. (2019). Industry 4.0 and its impact on skills development on built environment professionals: A South African perspective. 43rd AUBEA Conference-Built to Thrive: Creating Buildings and Cities that support individual well-being and community prosperity. Noosa, Australia.




DOI: https://doi.org/10.24294/jipd8198

Refbacks

  • There are currently no refbacks.


Copyright (c) 2025 Malingaka Maoeng, Khululekani Ntakana

License URL: https://creativecommons.org/licenses/by/4.0/

This site is licensed under a Creative Commons Attribution 4.0 International License.