Impact of weather conditions on labours’ productivity in the Nigerians’ construction industry

Nuruddeen Usman, Wesam Salah Alaloul, Sati Daniel Turse, Muhammad Ali Musarat

Article ID: 4429
Vol 8, Issue 13, 2024

VIEWS - 19 (Abstract) 15 (PDF)

Abstract


Weather is almost inevitable and plays an important role in determining the duration of construction projects. The construction industry ultimately thrives upon the physical input, put in by the labours. The majority of the construction projects are executed in the outdoor environment and hence face a high impact of weather conditions. This study therefore evaluated the influence of weather conditions on construction workers’ productivity in Jos, Plateau State and proceeded to make recommendations geared towards the improvement of construction workers’ productivity in Jos. The study was conducted through the direct observation method. Three hundred and ninety-six (396) works were purposively sampled in selected working sites. The outcome shows that during dry weather, there was considerably less significant productivity of manual excavation. In contrast, a large increase in blockwork and plasterwork productivity was observed with a percentage difference of 33%, 56.3% and 61%, respectively. On the other hand, during wet weather conditions, the labour productivity for manual excavation increases, whereas it decreases for block work and plasterwork with percentages difference of 58%, 40% and 47%, respectively. Besides, relative humidity and wind speed have no impact on labours’ productivity in dry and wet weather. Besides, the temperature has the most decisive impact on workers’ productivity. Moreover, wind speed and humidity have a lower influence on workers’ productivity. The construction industry stakeholder in Jos, Nigeria, would benefit from this study’s recommendations for reducing the influence of weather on the building sector. Besides, the output can be extended to other regions having similar characteristics.


Keywords


labours productivity; weather; construction industry; Nigeria

Full Text:

PDF


References


Abusafiya, H. A. M., & Suliman, S. M. (2017). Causes and effects of cost overrun on construction project in Bahrain: Part I (ranking of cost overrun factors and risk mapping). Modern Applied Science, 11(7), 20.

Akinbode, O. M., Eludoyin, A. O., & Fashae, O. A. (2008). Temperature and relative humidity distributions in a medium-size administrative town in southwest Nigeria. Journal of environmental management, 87(1), 95-105.

Alaloul, W. S., Musarat, M. A., Mehmood, H., & Altaf, M. (2021). Assessment of labour productivity in road construction projects of Pakistan. Journal of Civil Engineering, Science and Technology, 12(1), 32-38.

Alinaitwe, H. M., Mwakali, J. A., & Hansson, B. (2007). Factors affecting the productivity of building craftsmen‐studies of Uganda. Journal of Civil Engineering and Management, 13(3), 169-176.

Alrefaie, A. M., Abdul-Samad, Z., Salleh, H., et al. (2023). Modelling labour productivity of reinforcement bar using polynomial regression: a study on a tropical country’s weather. International Journal of Construction Management, 23(10), 1633-1641.

Atibu, M. (2015). An investigation into factors causing delays in road construction projects in Kenya.

Dasgupta, S., van Maanen, N., Gosling, S. N., et al. (2021). Effects of climate change on combined labour productivity and supply: an empirical, multi-model study. The Lancet Planetary Health, 5(7), e455-e465.

Durdyev, S. (2020). Review of construction journals on causes of project cost overruns. Engineering, Construction and Architectural Management.

Ebele, N. E., & Emodi, N. V. (2016). Climate change and its impact in Nigerian economy. J Sci Res Rep, 10(6), 1-13.

Ekoh, H. C. (2020). Analysis of rainfall trend in Sokoto State, Nigeria (1987-2016). World News of Natural Sciences, 28.

Harvey, E. J., Waterson, P., & Dainty, A. R. J. (2018). Beyond ConCA: Rethinking causality and construction accidents. Applied ergonomics, 73, 108-121.

Hasan, A., Baroudi, B., Elmualim, A., & Rameezdeen, R. (2018). Factors affecting construction productivity: a 30 year systematic review. Engineering, Construction and Architectural Management.

Holstein, J. A., & Miller, G. (2017). Social constructionism and social problems work. In: Constructionist Controversies. Routledge. pp. 131-152.

Jung, M., Park, M., Lee, H. S., & Kim, H. (2016). Weather-delay simulation model based on vertical weather profile for high-rise building construction. Journal of construction engineering and management, 142(6), 04016007.

Kamta, F. N., Schilling, J., & Scheffran, J. (2020). Insecurity, resource scarcity, and migration to camps of internally displaced persons in northeast Nigeria. Sustainability, 12(17), 6830.

Krejcie, R. V., & Morgan, D. W. (1970). Determining sample size for research activities. Educational and psychological measurement, 30(3), 607-610.

Lee, V. H. (1972). Ecological aspects of the Jos Plateau, Nigeria. Bulletin of the World Health Organization, 46(5), 641.

Manoharan, P., Subrahmanya, C., & Chengalur, J. (2017). Space weather and solar wind studies with OWFA. Journal of Astrophysics and Astronomy, 38, 1-8.

Moda, H. M., Filho, W. L., & Minhas, A. (2019). Impacts of climate change on outdoor workers and their safety: some research priorities. International journal of environmental research and public health, 16(18), 3458.

Musarat, M. A., Alaloul, W. S., & Liew, M. (2021a). Impact of inflation rate on construction projects budget: A review. Ain Shams Engineering Journal, 12(1), 407-414.

Musarat, M. A., Alaloul, W. S., & Liew, M. (2021b). Inflation rate and labours’ wages in construction projects: economic relation investigation. Engineering, Construction and Architectural Management.

Musarrat, M. A., Inderyas, O., Khan, S., & Shah, A. A. (2017). Causes of delay in the execution phase of construction projects in khyber pukhtoonkhwa pakistan. Sarhad University International Journal of Basic and Applied Sciences, 4(1), 62-70.

Narocki, C. (2021). Heatwaves as an Occupational Hazard: The Impact of Heat and Heatwaves on Workers’ Health, Safety and Wellbeing and on Social Inequalities. ETUI Research Paper-Report.

Ogunode, N. J., & Kolo, F. (2021). Effects of Insecurity on Basic Education Administration in Northern Nigeria. International Journal of Discoveries and Innovations in Applied Sciences, 1(7), 1-8.

Ogunrayi, O. A., Akinseye, F. M., Goldberg, V., & Bernhofer, C. (2016). Descriptive analysis of rainfall and temperature trends over Akure, Nigeria. Journal of Geography and Regional Planning, 9(11), 195-202.

Olubajo, O. O., & Babatunde, J. O. (2017). Empirical study on rainfall patterns and construction programme provisions in Jos, Nigeria.

Padwe, J. (2020). Disturbed forests, fragmented memories: Jarai and other lives in the Cambodian highlands. University of Washington Press.

Radevsky, R., & Taylor, C. (2012). The effect of adverse weather on construction sites. Eff. Advers. Weather Constr. Sites., 78, 1-62.

Raimi, M. O., Vivien, O. T., & Oluwatoyin, O. A. (2021). Creating the healthiest nation: Climate change and environmental health impacts in Nigeria: A narrative review. Morufu Olalekan Raimi, Tonye Vivien Odubo & Adedoyin Oluwatoyin Omidiji (2021) Creating the Healthiest Nation: Climate Change and Environmental Health Impacts in Nigeria: A Narrative Review. Scholink Sustainability in Environment. ISSN.

Raziq, A., & Maulabakhsh, R. (2015). Impact of working environment on job satisfaction. Procedia Economics and Finance, 23, 717-725.

Rehman, S., Sheergojri, I. A., Rehman, I. U., et al. (2022). Health Impacts of Construction Workers: A Short Introduction. In: Ecological and Health Effects of Building Materials. Springer. pp. 371-381.

Rupp, R. F., Vásquez, N. G., & Lamberts, R. (2015). A review of human thermal comfort in the built environment. Energy and buildings, 105, 178-205.

Schuldt, S. J., Nicholson, M. R., Adams, Y. A., & Delorit, J. D. (2021). Weather-related construction delays in a changing climate: a systematic state-of-the-art review. Sustainability, 13(5), 2861.

Senouci, A., Al-Abbasi, M., & Eldin, N. N. (2018). Impact of weather conditions on construction labour productivity in Qatar. Middle East Journal of Management, 5(1), 34-49.

Setzer, J., & Benjamin, L. (2020). Climate litigation in the Global South: constraints and innovations. Transnational Environmental Law, 9(1), 77-101.

Shanker, R., Bhanugopan, R., Van der Heijden, B. I. J. M., & Farrell, M. (2017). Organizational climate for innovation and organizational performance: The mediating effect of innovative work behavior. Journal of vocational behavior, 100, 67-77.

Solomon Zi, W., & Hyacinth M, D. (2020). Climate Change, Rainfall Trends and variability in Jos Plateau. Journal of Applied Sciences, 20(2), 76-82.

Yuan, J., Yi, W., Miao, M., & Zhang, L. (2018). Evaluating the impacts of health, social network and capital on craft efficiency and productivity: A case study of construction workers in China. International journal of environmental research and public health, 15(2), 345.




DOI: https://doi.org/10.24294/jipd4429

Refbacks

  • There are currently no refbacks.


Copyright (c) 2024 Nuruddeen Usman, Wesam Salah Alaloul, Sati Daniel Turse, Muhammad Ali Musarat

License URL: https://creativecommons.org/licenses/by/4.0/

This site is licensed under a Creative Commons Attribution 4.0 International License.